All horizontal and vertical new construction, renovation works, additional works
Building Permit (New Construction) BASIC Requirements:
- Duly accomplished application forms, signed by the owner/ applicant,signed and sealed by respective engineers/ architect,notarized. Forms are available at the Office of the Building Official)
- Eight (8) sets of Construction plans/Blueprints : scale 1:100
- Photocopy of updated PTR /PRC ID /Accredited Professional Organization ID (Affix 3 original specimen signature in BLUE INK and stamp Professional’s Seal)
- Photocopy of owner’s valid ID ( preferably government issued ID)
- Authorization Letter to transact in behalf of the owner or SPA from owner/applicant
- Five (5) sets Notarized Bill of Materials (BOM)/ Cost Estimate,
- Five (5) sets Notarized Specifications
- Five (5) sets Electrical Design Analysis, Voltage Drop Calculation, Short Circuit Calculation (duly signed and sealed by a professional Electrical Engineer)
- Locational Clearance from City Zoning Office
- Fire Safety Evaluation Clearance (FSEC) from Alabang Fire Department
- Construction Safety and Health Program (CSHP) approval from DOLE,(BOM< or = P3M apply in Las Piñas,BOM > P3M apply in Manila )
- Construction Business Permit from BPLO or City Tax ( for non-contractor) With Contractor-Notice of Construction and photocopy of PCAB License
- Certified True Copy of Transfer Certificate of Title (TCT) from Registry of Deeds Or photocopy of Deed of Absolute Sale
- 1 logbook
- 2 long folders (white)
- 1 Long Expanding Plastic Envelope (will be returned upon release of permit together with applicant’s copy of submitted documents)
- STANDARD PLAN EVALUATION CHECKLIST
AS REQUIRED
- Three (3) sets Structural Calculation ( for building/structure 2-storey and above, warehouse and additional floors, etc.)
- Three ( 3) sets Geo-technical Investigation Report by a DPWH Accredited Contractor ( for structure 3-storey and above, for 2-storey with roof deck or basement)
- PDF copy of Geo-technical Investigation Report, Structural Calculations in CD/DVD/USB (for Commercial,Industrial and Institutional Buildings, etc.)
- PDF copy of Construction Plans/Blueprint in CD/DVD/ USB (for Commercial, Industrial, Institutional Buildings,etc.)
- Photocopy of Old Building Permits and Approved Construction Plans ( for Renovation/Extension/ Additional Floor)
- Notarized Authorization from Lot owner to construct ( If applicant is not the lot owner)
- Notarized Neighbor’s Consent
- EPNRO clearance ( for need to cut trees, etc.)
- LLDA Clearance or LLMO Clearance (for car wash,laundry shop,restaurant,high occupancy buildings, etc.)
- Environmental Compliance Certificate (ECC) from DENR ( for Gen-set, etc.)
- Height Clearance Permit / Height Limitation from CAAP (ATO) (for building/structure 4-storey and above
- MMDA Clearance (if lot is adjacent to creek or river, etc.)
- DPWH Clearance (for lot fronting highways,etc.)
- HLURB Clearance ( for condominium projects, etc.)
- NGCP Clearance ( for lot near transmission lines)
- DOH-BHDT Clearance (for telecom antenna, etc.)
- Energy Regulatory Board (ERB), (for gas stations)
- Seismic Accelerograph ( for buildings 50 meters and above,commercial area with 10,000.00 sq. m. gross floor area or 1,000 occupants, etc.)
NOTE: The Structural Engineer and the Professional Electrical Engineer who will sign and seal plans and calculations should be the same.
BUILDING PERMIT (Interior Renovation): BASIC REQUIREMENTS
- Permit Application Forms (Duly accomplished ,signed by owner/applicant, signed and sealed by respective professionals), Forms are available at the Office of the Building
- Eight (8) sets Construction Plans/Blueprints,scale 1:100,signed by owner/applicant, signed and sealed by respective professionals)
- Photocopy of updated PTR/PRC ID/ Accredited Professional Organization ID
- Photocopy of valid ID of owner (preferably government issued ID)
- Notarized Authorization Letter to transact in behalf of owner or SPA from owner/applicant
- 5 sets Notarized Bill of Materials/Cost Estimate
- 5 sets Notarized Specifications
- 5 sets Electrical Design Analysis,Voltage Drop Calculation & Short Circuit Calculation ( signed and sealed by a Professional Electrical Engineer)
- Locational Clearance from City Zoning Office
- Fire Safety Evaluation Clearance (FSEC) from Alabang Fire Department
- Construction Safety and Health Program (CSHP) approval from DOLE (BOM < or = P3M, apply in Las Piñas, BOM > P3M apply in Manila.)
- Construction Business Permit from BPLO, Contractor’s Business Permit or City Tax for non- Contractor, if with Contractor, provide Notice of C onstruction and PCAB License
- Secretary’s Certificate ( for Corporation) Attach clear photocopy of valid IDs of owner and authorized representative.
- Contract of Lease or Award Notice ( if property is not owned)
- One logbook
- 2 Long folders (white)
AS REQUIRED
- PDF copy of Construction Plans/Blueprints in CD/DVD/USB ( for Commercial, Industrial, Instituional, etc.)
- Photocopy of old Building Permits and Approved Construction Plans
- 3 sets Structural Calculation and PDF copy in CD/DVD/USB ( for warehouse, etc.)
- LLDA Clearance or LMO Clearance ( for car wash, laundry, restaurant, etc.)
- Environmental Compliance Certificate (ECC) from CENR ( for Gen-set, etc.)